25 May 2010

Hidden Valley Mine Access Road Project

Engineering + Infrastructure Projects, Projects, South-East Asia No Comments
Point were engaged by Morobe Mining Joint Venture to undertake an initial engineering assessment on the 35km  access road to the Hidden Valley Mine.

 

This assessment was focused on safety, structure and usability. Point’s assessment and report included a detailed analysis of the road with prioritisation of works and identification of critical sections. Subsequently, Point have commenced the management of the design and delivery phases of the project. This project will result in increased safety, limit the risk of road failure and reduce maintenance costs.
Comments are closed.