Non-Directional Beacon and Tower Replacement Project

Aviation, Engineering + Infrastructure Projects, New South Wales, Northern Territory, Projects, Queensland, Victoria, Western Australia No Comments

Point managed a variety of survey activities at 124 non-direction beacon sites across Australia on behalf of Airservices Australia.

The range of surveys being undertaken include geotechnical, cadastral, electro-magnetic radiation, structural condition, environmental and hazardous material investigations. In total, there are over 400 different types of surveys being undertaken at the non-directional beacon sites over a 3 month period. The project requires very tight management due to the high tempo of the survey activities and the range and quantity of survey reports being received from the survey contractor.

Point is also providing project management support for the replacement of the non-direction beacon towers at 18 of these sites.